The custodian of the physical plant: every tank, sump, watt, litre, and pascal that keeps the GreenSky Breeding Station standing, sealed, and wet. Facilities owns the building envelope, the system rooms across fresh, brackish, and saltwater, the power and water plant, and the biosecurity zoning that separates a thriving collection from a wipe-out.

Doc Control AE-FAC-0001 Revision A Owner Facilities Manager Reports To Station Director / NEREID Ops Coverage 24/7 · AquaLink mesh + on-call trades Classification RESTRICTED // TIDEWATER-EYES-ONLY

Mission

Facilities & Environment exists to guarantee that the built environment never becomes the weak link in life-support. We deliver the structure, water, power, atmosphere, and access control that Breeding and husbandry depend on to keep live stock alive and the restricted fraction of it sealed behind a pressure cascade. Where the AquaLink mesh owns the sensors and the alarms, Facilities owns the plant those sensors watch — the pumps, skimmers, chillers, RO trains, and gaskets that fail loudly if we do not maintain them. Nothing here is decorative. The Abyssal Holding walls are rated, the cascade is measured, and the standby chiller for the cold-water systems is tested every week.

Facility Telemetry

Operational Zones129 husbandry · 3 plant
Built Footprint24,800 m²hub + dock + conservatory
Systems Online98.6%340 of 345 loops
Biosecurity Tiers4Open → Restricted
Water Volume Under LSS1.94 MLall systems + reservoirs
LSS Power Uptime99.994%trailing 12 mo
Envelope Integrity99.9%0 flood · 287 d
Open Work Orders293 critical · AquaLink

Facilities Functions Register

Facilities is organized into six standing functions, each with a named lead reporting to the Facilities Manager and a defined authority ceiling for work inside graded biosecurity tiers.

FunctionCodeLeadPrimary ChargeTier Work CeilingStatus
Structure & Building EnvelopeFAC-STRSr. Eng. R. HalvardLoad-bearing structure, tank stands, bunding, flood compartmentation, roof & glazing of the Conservatory.Open → Quarantine● Nominal
Aquatic Systems PlantFAC-SYSSystems Eng. M. OkaforSumps, racks, manifolds, filtration, skimming, UV/ozone, chillers/heaters across fresh/brackish/salt.Open → Quarantine● 340/345 loops
Utilities · Power & WaterFAC-UTLPlant Eng. T. SaitoGeneration, distribution, UPS/genset, RO & seawater make-up, mixing reservoirs, autonomy.Open → Restricted (escort)● Green
Biosecurity ZoningFAC-BSZContainment Arch. L. VossTier zoning, footbaths, quarantine isolation, the Abyssal pressure cascade, invasive & pathogen control.Open → Restricted● Sealed
Fleet Dock & Stock TransferFAC-DCKDockmaster K. RennVessel berths, haul-out, live-stock transfer, ballast & bilge biosecurity, dispatch bay.Open → Quarantine◐ Berth 3 in PM
Security & Access ControlFAC-SECAccess Marshal D. NgataBadge/biometric tiers, two-person interlocks, dive-lock control, CCTV, key management.Open → Restricted● Armed

The GreenSky Breeding Station

The Station is a partly-submerged coastal hub of 24,800 m² of built footprint arranged around a central Water Prep & Reservoir hall from which every system draws. Husbandry zones radiate outward by salinity — freshwater halls to landward, the saltwater Reef Conservatory seaward under a 22 m daylight roof — and the restricted Abyssal Holding wing is buried at the cold, dark heart of the building under a pressure-cascade. Beyond the hub, the Fleet Dock & Dispatch handles vessels and live transfers, and two drifting Gyre Stations (Pacific & Atlantic) extend the operation onto the open ocean under their own solar/wave power.

Footprint

24,800 m²

Built area of the hub, dock, and Conservatory. ~14,400 m² of that is wetted system room; balance is plant, circulation, and containment.

Envelope

Bunded Wet Shell

Every system room is fully bunded to a 110% spill volume and drains to monitored sumps — a flood isolates, it never spreads.

Core

Abyssal Holding (Restricted)

Buried pressure-cascade wing for deep, cold, and high-value stock under independent power, chilling, and the two-person rule.

Design philosophy (Facilities standard FAC-STD-001): the Station is engineered so that any single failure degrades gracefully toward safety, never away from it. Power loss closes salt-water and inter-system valves. A leak isolates its own bund. Quarantine air flows in, never out. The Station protects the collection from the ocean, and the ocean from the collection.

Facilities Documentation

Zone Summary

The twelve operational zones at a glance — full areas, systems, and climate detail live in the Station Map (AE-FAC-0010) and Site Plan (AE-FAC-0011).

ZoneWater TypeBiosecurity TierAreaStatus
Cichlid HallFreshwaterGeneral1,840 m²● Nominal
Livebearer RacksFreshwaterGeneral1,260 m²● Nominal
Invertebrate RoomBrackishGeneral920 m²● Nominal
Reef ConservatorySaltwaterOpen / General3,400 m²● Nominal
Aquatic Flora PropagationFresh · CO₂General880 m²● Nominal
Quarantine & TriageMixedQuarantine1,150 m²◐ 4 lots in hold
Water Prep & ReservoirsRO + mixingGeneral1,600 m²● Green
Abyssal HoldingSaltwater · cold/deepRestricted1,420 m²● Sealed
Fleet Dock & DispatchSeawater intakeOpen → Quarantine2,600 m²◐ Berth 3 PM